ON-SITE TIMBER OFFICE
Concept -1
OBJECTIVE
Timber structured office space at the work site.
​
Office space for client meetings and exhibition displays for upcoming developments at the site.
PLANNING
ABOUT THE OFFICE
A designated area designed to facilitate professional interactions and showcase new projects. This office space is equipped to host client meetings, providing a comfortable and functional environment for discussions, presentations, and negotiations. Additionally, it features exhibition displays to highlight and promote upcoming developments or projects at the site. These displays might include detailed plans, models, and visual presentations to effectively communicate the scope and vision of the developments. The setup is designed to create a professional atmosphere that supports both client engagement and the effective presentation of new initiatives.
INSTALLATION PROCESS
STEPS OF CONSTRUCTION
The installation process for a precut timber house is efficient and streamlined. It starts with site preparation and foundation work, followed by the delivery of precisely cut timber components. These pieces, designed to fit together perfectly, are quickly assembled on-site, starting with the framing of walls, then the floors and roof. This method reduces construction time, minimizes waste, and ensures high-quality, accurate building.
COMPONENTS CROSSECTION
Insulating a timber house is crucial for maintaining energy efficiency and comfort in wooden homes. This process involves adding insulating materials such as wool, foam, or cellulose to the walls, roof, and floors to reduce heat loss in the winter and keep the house cool in the summer. Effective insulation not only lowers energy bills but also contributes to a more sustainable living environment by reducing the home's carbon footprint. Furthermore, it enhances the durability of the timber structure by preventing moisture build-up, which can lead to decay and other structural issues.
RENDERS